1 November 2005
Progress Report November 2005
Multiplex, Lumiére’s building contractor, shown here installing reinforcements and formwork in preparing the pool area for its concrete slab pour. The dramatic triangular columns divide the 25 metre pool from the indoor/outdoor 50 metre pool.